
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
NEUESTE BEITRÄGE
- 1
Step by step instructions to Think about Disc Rates Across Various Banks19.10.2023 - 2
Satellite space quiz: What's orbiting Earth?25.11.2025 - 3
Google's proposed data center in orbit will face issues with space debris in an already crowded orbit25.12.2025 - 4
Drones, physics and rats: Studies show how the people of Rapa Nui made and moved the giant statues – and what caused the island’s deforestation26.11.2025 - 5
Illegal entries into Germany halve over two years, border police say01.01.2026
Ähnliche Artikel
Opening Achievement: 8 Methodologies for Compelling Using time productively11.08.2023
From blowouts to big interiors, ‘Tuscan Mom’ style is Gen Z’s answer to beige burnout01.04.2026
Oil rises above $115 and Asia stocks slide as Iran war escalates29.03.2026
A definitive Manual for Well known Fragrances06.06.2024
Brazil's agricultural research agency gets cannabis research greenlight21.11.2025
Human evolution’s biggest mystery has started to unravel. How 2025 tipped the scales26.12.2025
The most effective method to Settle on Informed Conclusions about Senior Insuranc.19.10.2023
Step by step instructions to Pick the Right Dental specialist for Your Teeth Substitution16.10.2023
German diesel hits new records over Easter weekend06.04.2026
Flourishing in Retirement: Individual Accounts of Post-Vocation Satisfaction25.09.2023














